My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2501 W CASINO RD 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
2501
>
2501 W CASINO RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:57:06 PM
Creation date
1/25/2017 9:19:27 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br /> Told Development Corpocation Contract <br /> January 14 . 1991 <br /> Yeac 2ero. <br /> scope of Nock. <br /> 1�t the completion of the initial plantiap, the site will be <br /> viaited for the first time in year "sero" to (1) •atablish photo <br /> points •nd transtcta, (2) iasp�ct pl�ntinps, (3) r�va�w mitipation <br /> plan, and (4) discus� the qoals of the mitipation plan wstn the <br /> City of Evarett. <br /> 11t thia time , a pAoto journal will be iaitiat�d usiaq a three- <br /> rinp bind�r. Copi�s of the journal will be provided to TOLD <br /> Development Corporation, the City of Ev�r�tt, plua one will be <br /> retain�d with the monitoria9 consultanti, lES 1lisociat�a . <br /> Meet on-site with th� City of Everett �nd the desiQn team to <br /> review the miti9aiion plan and to obtaia an underst�ndinq of the <br /> misunde undi p�eCon Vthe part�of the monitorinq t am aaa to the <br /> •xpectationa ot the plan. <br /> Cost Estiaute. <br /> 6enior Biolopist 1 day P 450 .00 450 .00 <br /> Techniclan 1 day @ 150.00 145 .00 <br /> Mileaqe �0.00 <br /> Mincellaneoua Expenses 110 .00 <br /> Overheaa Ezpenses (15t) <br /> Year Zero: 825.00 <br /> I <br /> Year One. <br /> Scope af fiork. ' ' <br /> Year one will conaiat of two sita vitits. The first s1t� <br /> vlsit will be in May at th� b�0inninq of "preen up" to �valuate <br /> survival af the plantiaqs. Th� iucc�se or t�ilure ot the laitial <br /> atart-ua will be bas�d on th� voala provid�d tor in th� mitiqation <br /> plan. <br /> The aecond aite visit will be coaduct�d at t�e end of th� <br /> qrowin9 s�ason. At thi• tim�, abund�nca, health, and r�Productive <br /> status will be recorded. <br /> . � <br />
The URL can be used to link to this page
Your browser does not support the video tag.