Laserfiche WebLink
. r <br /> Told Development Corporatioa Coatzact <br /> January 1�, 1991 <br /> Aanual Report : <br /> Senior 8iolopist 1 hour @ 70.00 <br /> staff Hiolonist 3 houra ( �0 .00 �0.00 <br /> clericsl 3 houza P 21.50 120.00 <br /> Oftice Support 2 houra @ 27.50 64.50 <br /> Overhead SS.00 <br /> 150.OQ <br /> Year Two: 83�.50 <br /> Year Three. <br /> Scope of Work. <br /> The site will be •valuat�d in �arly swnm�r to (1) inspect the <br /> aroWth characteristica of plant�, qround cov�r and density, and <br /> Qermination rate to determine if the pl�nta h�v• dev�loped a <br /> healehy qrowinq proqram and ar• on the w�y to b�cominq a viable <br /> vrcetative community, �nd �y� ta �valu�!e th• composition p�rc�nt <br /> and density of noxioua or non-d�iirabl• inv�d�z apecies such aa <br /> reed canacyqraae. Scots broom, hardhack, •tc. <br /> The second aite visit will be conduct�d at the �nd of the <br /> growinp aeaeon of the third rear aa part of the three year <br /> evaluation. A three-y�ar evaluation will be compl�t�d as a part of <br /> the third yeaz annual report. The third year annual r�pott will be <br /> evaluation oft he succens ofdthecinitiqation in meeting thelpoals of <br /> the mitiaation plan will b� provided. At this time, if it is <br /> detezmi::ed that the mitipation plan ia not meetinq the qoals , a <br /> meetinq will be called with th� City of Everett, the mitiqation <br /> desaqn consultant, plantinp coatractot and othera deemed advisable <br /> by the City of Everett to �stabllah a continq�ncy plan for years <br /> four ana five to brinq the wetland into eonformance with the poals <br /> and ob�ectives of the mitiq�tion plan. <br /> Cost Eatimtte. <br /> Site Viaits (Two) : <br /> Techt�ician 2 days @ 200 .00 <br /> Mileaqe 400 .00 <br /> 180.00 <br /> � <br />