My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2525
>
BASE FILE
>
2525 W CASINO RD BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2019 1:17:18 PM
Creation date
1/25/2017 9:33:23 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � H <br /> p � ' <br /> HZ� <br /> �C a <br /> H� <br /> � � � ~ <br /> �z� <br /> � <br /> OH <br /> ��g <br /> (�]Y (] ♦J <br /> �' 6. Have definable evidence of reproduction or spzead <br /> yH <br /> r �..� y of replanted plants, �:ither through reseeding or suckering of <br /> g�y shrubs and trees . This would be reflected as a 25 percent <br /> increase in total ehrub cover and a 25 percent increaee in <br /> � � ~ deciduous trees between the third and the end of the fitth <br /> Hd in growing seasons. <br /> Physical changes or "acts of God" which could modity <br /> the wetlands either by increasing or decreasing the wetness <br /> � would not be considered a violation of mitigation conditions <br /> by the City of Everett or the Department of Ecology and <br /> Cushing Group would not be held responsible. <br /> 12. Pralucte. <br /> " At the end of the five year monitoring plan the followinq <br /> products will be in place at the City of Everett and The <br /> '�t Cushing Group Offices, if zequested and the monitoring <br /> '_� coneultants office: <br /> w <br /> 1. The wetlands mitigation plan <br /> ' ' 2. Grading plan . <br /> t' H 3 . Planting plan <br /> ��� 4. Five annual narrative reports <br /> �� 5. Third year ptogrees report <br /> �' " 6, project completion report <br /> i ; 7. A photo log of all site visits <br /> '—' This constitutes the mitigation plan for the Faine Field <br /> ' " Development site by IES Associates. <br /> Sincerely, <br /> .. ,� �(/„"�N � ��/r�� <br /> � <br /> � R.L. Van Wormer <br /> ' Senior Biologist <br /> IES Associatea <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.