Laserfiche WebLink
�� 5 <br /> D � <br /> �Hy <br /> H� � I <br /> Ky � 1 <br /> �H � <br /> NH <br /> �z � <br /> � <br /> OH <br /> O <br /> �� n❑ I <br /> 9 y a � 1. Introduction. <br /> t� � <br /> �yy `3 The proposed mitigation plan is based on the wetland:; <br /> n y delineation made by the Coot Company and agreed to by the <br /> � Washington Department of Ecology and cnnditions set forth by <br /> �7 the City of Everett and the Washington Department of Ecology <br /> y o � during the wetland negot.i.ations. <br /> 2. Existfnq Conditions. <br /> Currently the site h�s three separate wetland areas. <br /> They are located in the northwest, in thP south center, and in <br /> the southeast portions of the site. The south center and the <br /> � southeast wetlands are connected throuqh a culvert under <br /> ' Casino Road to the Ci`y of Everett storm and drainage systea�. <br /> ; After heavy rains ot extended rain: , there is the probability <br /> that the northwestern wetland overflows into the two southern <br /> '�1 most wetlands o�i the site. <br /> '�' The site slopes from the northwest to tl�e southrast. <br /> There are two upland areas on the site; one located in the <br /> � ' northeast curner of the site, while the second is located <br /> '�' along the west property boundary. The site's contours follow <br /> the configuration of the wetlands ending with the lowest <br /> '�' depression being in the southeastern most wetland abutting <br /> ' ' Casino Road. The highest elevations are in north and west <br /> � sides with the highest point being in the northeast corner. <br /> �' The highest point of the site has an approximate elevation of <br /> �' S84 feet with the entire north boundary and the west boundary <br /> � being in exces; of elevation 565 feet. <br /> 1-' 3. Proposecl Project. <br /> � The proposed project includes the construction of two <br /> �e� large buildings on the site. The larger of the two buildings <br /> ' will be built along the north property boundary with the <br /> smaller '.�uilding being built in the soLthwest corner of the <br /> site abutting Casino Noad and Paine Field I3usiness Park , Phase <br /> I . <br /> The project will be excavated down to elevation 560 along <br /> the south side of the northern most building lowerirg the <br /> 1 <br />