My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 W CASINO RD PACIFIC CARGO 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2525
>
PACIFIC CARGO
>
2525 W CASINO RD PACIFIC CARGO 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 9:45:54 AM
Creation date
1/25/2017 9:45:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2525
Tenant Name
PACIFIC CARGO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. ENVIRONMENTAL ELGMENTS <br /> I. Earth <br /> a. Generel description of the site(circle one): Flat,rolling,hilly,steep slopes,moun�ainous,other.. .... <br /> b. What is the steepest s!ope on the site(epproximete percrnt slope)? • <br /> The site is rclatively tlat with a slight incline to the north,less than S%. <br /> c. What genera�types of wils are found on the site(for exemple,clay,sand,gravel.peat,muck)^ If you <br /> know the clessificetion of agriculiurel wils,specify them and note any prime farmland. <br /> The site is completely paved with e.ephalt except for lendscaping. <br /> d• Are therc surface indications or history of unsuble soils in the immediaie viciniry? 1(so,descnbe. <br /> No <br /> e. Dacribe the purpose,type,end approximete quemities of eny filling or grading proposed. Indicate <br /> source of fill. <br /> No clearing or filling will occur <br /> f. Could erosiun occur as a rcsu!t of dea�ng,conswction,or use? If so,generally describe. <br /> No clearing will a.:ur <br /> g. About what percem o(the site will be covercd with impervious surfnces nRer project construction(for <br /> erample,asphalt or buildings)? <br /> Same amount as is currently covercd.No chenge. <br /> h. Proposed measures�o rcduce or control erosion,w other impacts to the earth,if eny; <br /> None required . <br /> 2.Air <br /> a. What rypes of emissians to the air wuuld resul�from the proposal(i.e.,dusC automobile,a' n, <br /> industtial wood smoke)during conswction and when the project is completed? If any,genen .y dacribe <br /> and give approximate quantities if knawn. <br /> Therc will be no emissions during construction because Uie building is exis[ing. Air emissions will rcsult <br /> from nvo main sources at the proposrd facility(ollowing completion of canswetion:the coating operation <br /> nnd the abracive blasting operation. <br /> Marimum annual emissions(tons per year�from both operaiions arc projected ss follows: VOC 13.96; <br /> HAP 1.68; TAC J..18; PM I?I5. <br /> P¢ific Cugu NOC /� <br /> s�p�emx�.zan �y <br />
The URL can be used to link to this page
Your browser does not support the video tag.