My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 W CASINO RD PACIFIC CARGO 2016-01-01 MF Import
>
Address Records
>
W CASINO RD
>
2525
>
PACIFIC CARGO
>
2525 W CASINO RD PACIFIC CARGO 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 9:45:54 AM
Creation date
1/25/2017 9:45:39 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2525
Tenant Name
PACIFIC CARGO
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.. �. . <br /> /�/BL/C f�YORKs <br /> August 30, 2001 <br /> Rick Marincin <br /> Pacific Cargo Co., LLC <br /> 830 East "F" Street <br /> Tacoma, WA 98421 <br /> RE: Owner: Paine Field Business Park <br /> Job Address: 2525 W. Casino Raod <br /> Plan Check No: M0108-Q40 <br /> Dear Mr. Marincin: <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only, additional revisions or additions may be required by other <br /> departments (such as Utilities, Planning or Fire). All references refer to the 1997 l)niform <br /> Huilding Code, as amended by the State of Washington and/or Wash�neton State Energy Code <br /> 2001 Edition, unless stated otherwise. <br /> In order for the processing of your application to continoe, it will be necessary to provide the <br /> Building Divtsion with two complete new sets of drawings reflecting the corrections <br /> �re uested. <br /> 1. Please provide the actual stamped (not preliminary) engineering for the new door. <br /> ,� �/ 2. Section 4502.2.8 of the Uniforni Fire Caie requires not less than 3 feet of clear space <br /> � around all portions of the booths. <br /> `(�r J 3. Provide verification that the paint booth duct will terminate in a Iocation complying with <br /> the UFC 4502.5.5. <br /> Please prepare a response letter showing where each item in this corcection letter is addressed on <br /> the plan set. <br /> Upon resubmittal of the Jrawings, your application will be given priority and plan review will <br /> recommence. <br /> All requireJ submittals shall be of sufficient detail and contain sufficient information to ensure that <br /> the proposed swcmre will be constructed in compliance with all adopted codes. <br /> Sincerely. <br /> '��-�'"' �-_ <br /> . Y <br /> Steve Miller <br /> Associate Enginccr <br /> 111111 PI`1-ANSfR\III I FB N��I�n.i4n i•C�x 1\H V 1 PIN <br /> CI7Y OF EVERETT• 3200 Cedar Street• EverelL WA 98201 •(425)257-8800 •Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.