My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 W CASINO RD AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
2600
>
AVIATION TECHNICAL SERVICES
>
2600 W CASINO RD AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 12:31:54 PM
Creation date
1/25/2017 10:12:24 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2600
Tenant Name
AVIATION TECHNICAL SERVICES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />Date 111-11/1_3 1P.ermit:.S_ 131 D- 00 3 <br />Contractor. n 5 <br />Owner: 111 MIMI c, fii.r,s <br />Site Address:,O0_� <br />F INSPECTION REQUESTED <br />ELECTRICAL <br />BULL -5A^ <br />MECHANICAL <br />PLUMBING <br />❑ Temp Service <br />JUIFER ground UV <br />❑ Gfoundwork/Slab <br />[j Groundwork/Slab <br />❑ Groundwork <br />❑ Footing <br />❑ Rough In <br />❑ Rough In <br />❑ SlabrCondwt <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />LJ OK to insulate <br />❑ Service <br />❑ Framing <br />Cl Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />L) Plumbing Final <br />❑ Electrical Final <br />[]Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough In;Service <br />Hot Water Tank <br />[] Footing drains <br />❑ Ceiling Gntl <br />❑ Refrigeration <br />❑ Rough in <br />❑ Root drains <br />[]Building Final <br />Lj Gas Pipe Final <br />❑ NWT Final <br />{e k i ih�... <br />L� <br />OTHER OR CONSULTATION: -1 �5 -2G9 -Y_SY3 _•L�_w'• <br />Qall <br />r_ ice <br />❑ APPROVAL <br />U PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR TC O. <br />❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. <br />❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION <br />❑ CALL (425) 257•BBBI FOR REINSPECTION - 24 hour notice required <br />/ 7 <br />r. Inspecto_ — _ Dele:. f <br />Ein 110%) DAIABA . INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.