Laserfiche WebLink
Perteet Inc. <br /> 4 <br /> Retiming Signals for Pedestrians <br /> on Hewitt Avenue <br /> c\` Pedestrian walk I wan Times <br /> \ •n••••• w 9•cene Cycleseoenron <br /> ��. Noon Hourc�s�,er <br /> 00414 <br /> sr Second Cycle <br /> Noon Hour <br /> Port.Inc. AP- <br /> .a.._ <br /> ernemiw,15'NU t <br /> Benefits of Re-Timing <br /> Hewitt Avenue Signals <br /> Maximum Pedestrian Watt Time Average Vehicle Delay <br /> ®seconds seconds <br /> Noon Hour 51 <br /> 90 <br /> Seco <br /> C <br /> ed <br /> 11MM C Me PIM <br /> Ho 11111111M©®IEMIETEIEM 50% <br /> Colb ©NE® 23% WrIMMEETIIIITE <br /> etmore ©MIIIIIIIIMME®MMEIMEME <br /> Rockefeller <br /> Oakes <br /> ®Per..Inc. <br /> Senlemher IS 111114 <br /> Summary of Outstanding Issues <br /> Snohomish County Garage Operations <br /> • Reopening of Oakes at Pacific <br /> "After-event"at Everett Events Center <br /> • Review of major event with County Garage/Oakes in operation <br /> AM Signal Timing <br /> • Review of potential travel time savings for AM operations <br /> Implementation Schedule <br /> • Revise interior signals(pedestrians)by Thanksgiving <br /> • Revise exterior signals(traffic)by February/March <br /> Public Presentations <br /> • City Council Workshop-October 13 <br /> • County Redevelopment Committee-October 27 <br /> • Chamber/DEAC Luncheon-November 4 <br /> City of Everett 5 <br />