Laserfiche WebLink
Kirk Brooks <br /> From: McGuire, Peter D(peter.d.mcyuire@boeing.com] <br /> Sent: Tuesday, July 2ti, 2011 4:29 PA9 <br /> To: Hornor, Carson G; Aster�:orski, Leonard <br /> Cc: Collins, JeH A; Villene�.ve, Juhe; 'F'hil Newton@URSCorp.com'; EXT-Wright, Christopher M; <br /> EXT-Ringwald, William E; Larmay, Russell T <br /> SubJect: R[: 767 TowPath Phase 3 Contractor Laydow�i 8 Slurry Pit Layout <br /> Leonard - Just an FYI. I only discussed the laydown area near the rail receival bldg with <br /> Kirk Brooks. I had told him that the quary spall would be removed and we would re�eed <br /> once the project was complete and he was okay with that. <br /> Pcic McGuirc <br /> The Boeing Company <br /> Everett Site Services <br /> Land Use and Civic Affairs <br /> 425-238-3768 (cell) <br /> MIS OH-13 <br /> From: Homor, Carson G <br /> Sent: Tuesday, ]uly 26, 2011 4:17 PM <br /> To: Astemborski, Leonard <br /> Ce: McGuire, Peter D; Collins, Je(f A; Villeneuve, ]ulie; 'Phil._Newton@URSCorp.com'; EXT-Wright, Christopher M; EXT- <br /> Ringwald, William E; Larmay, Russell T <br /> Subject: 767 TowPath Phase 3 Contractor Laydown & Slurry Pit Layout <br /> Leonard, <br /> Attached is the proposed contractor laydown area and "slurry pit" reconfiguration for the 767 Tow Path Phase <br /> 3. Pete McGuire said today at the design review meeting that the City of Everett requested a layout showing <br /> the contractor laydown and "slurry pif' reconfiguration. Please submit these to the City along with the 2 full <br /> size IFC drawings I transmitted to you today. I'll put 2 copies o(these e`tachments on your desk. Gary Merlino <br /> Construction will be mobilize on-site 8-1-11 to set up ihe slurry pit and laydown areas and start saw-cutting <br /> concrete. Please confirm with the City of Everett that the contractor is authorized to proceed with this work. <br /> Carson Hornor <br /> Construction Administrator <br /> The Boeing Company <br /> (206) 949-0714 <br /> t <br />