Laserfiche WebLink
i <br /> ( <br /> � 4w <br /> �'"1THE AUSTIN BE&C ENGINEERS <br /> ��, COMP,ANY CONTItACT N40.2093 <br /> ARCHITECTS• EN6INEER6 • BUILDERB AUSTIN W.O. N91-5534 <br /> DATE: Aprll 23, 1991 <br /> APPROVAL RFOUEST H13 <br /> To: IIEBcC Engineers From: The Austin Company <br /> Karl Goeres James G. Peterson <br /> Project Manager Vice President & Program Manager <br /> V✓e request your approval on the following: <br /> Attached documents are submitted Cor approval and ��iry of Everett Buitding Permit for <br /> temporary wnswcGon offices for BECE and The Austin Company. <br /> Documents issued for permit: • <br /> � 2 copies: The Austin Company Drawing TOGI, dated 4-22-91 <br /> 2 copies: Frcehling & Robertson, Inc. Report of Pull-Out Tests on Minute Man An- <br /> chors, pages 1 & 2 <br /> 2 copies: Tie Down Engineering, Inc. Drawing No. MHP-111, pages 1 & 2 <br /> 2 copies: Northwest Building Systems Foundation Plan for 36 x 61 office (2 typical) <br /> 2 copies: Double Wide Blocking & Tie Down Recommendations <br /> O1 unit 28' x 57' (pages 1 & 2) ,� <br /> � 1 copy: Northwest Building System Trailer Brawings, sheets 1 to 4 for 28' x ST ��� <br /> Ooffice. <br /> �- 1 copy: Northwest Building Systems Trailer Drawings, sheets 1 to 4 for 36' x 60') z�ie Q <br /> office. q91788 <br /> O7.copy: Northwest Building System Trailer Drawings, sheets 1 to 4 for 36' x 60' <br /> office. 1/91789 <br /> � lcopy: Northwest Duilding System Trailer Drawings, sheets 1 to 3 tor 12' x 44' rzT � <br /> Toilet and Storage Trailer. <br /> Comments: <br /> Approved for Boeing: Approved for The Austin Company <br /> IIECE Date: nl. �• �� <br /> BECE Date: mes G. Peterson <br /> BCAG Date: Dale: `l — Z 3- � I <br />