Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CER I'11CATION <br /> •'ONTRACTOR: Wilder Construction ADDRESS: 3315 - 15th Street <br /> TTY: Everett STATE: WA 98201 DA IE: May 11, 2004 <br /> 'ROJECT 1TI'LE: Hewitt Sewer Replacement & Street Rehab. WORK ORDER NO. UT3076 • <br /> )A IE WORK COMPLETE: May 13, 2004 FINAL AMOUNT: $ 9,282,856.33 +WSST <br /> CONTRACTOR'S CERTIFICATION <br /> , the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> nd material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> uthorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> mployee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> ponies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> nderstand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I may have, arising out of the performance of said contract, which are not set forth in said estimate. <br /> (Al OiLX Pied c (Mk�� e✓ <br /> :ONTRACTOR TITLE J J <br /> Vilder Construction <br /> ;ubscribe.And sworn,tt)before <br /> ne e:• ) day of C P I' V <br /> / : 1 / Notary Public <br /> n and for th-'State of W:1.hington, residing at ,N161-3 '� <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> Certify the attached final APPROVED Date: A) /1'9 'Y <br /> stimate to be based upon actual <br /> aeasurep-nts and to b.true and correct. > !\ <br /> X1 <br /> Cons ction Manager Utilities Director <br /> Terry Henke Tom Thetford <br /> INSTRUCTIONS <br /> 'he Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> gents and forwarded with the Final Contract Voucher Certification. <br /> 'ontractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> ttached. <br /> revised 9/94 <br /> 5 <br />