Laserfiche WebLink
everett INSPECTION REPORT <br /> e 7 � <br /> Address ��l�d �i C "�=� - � ,�/y <br /> �d�D� Contractor�,�/���� [� <br /> � <br /> Owner <br /> Date <br /> TYPE OF INSPECTION REOUESTED <br /> ❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br /> p� ELEC: Pmt. No. G��f7 PLBG: Pmt. No. <br /> �� �O Temp. Elect ❑ Masonry ❑ Consultation <br /> ❑ Footing ❑ Framing ❑Groundwork <br /> ❑ Foundation ❑ Drywall, Nailing ❑ SVuct. Slab <br /> ❑ Ductwork V�Rough-In ❑ Final <br /> ❑Wood Stove �O�ervice f� <br /> ❑Gas Piping <br /> PROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> rl Please contacl inspector and arrange for apnointment. <br /> ❑Was not able to perlorm inspection. �y�c�_�8'�Q <br /> ❑ C.1LL� FOR REINSPECTION-- 74 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> i _� ����y _ <br /> � -- <br /> i -- <br /> Inspector � �7 _Da�c _----- <br /> T <br />