Laserfiche WebLink
� �. <br /> , , <br /> July 30, 1996 <br /> SCOPE OF WORK <br /> JOB 966104 <br /> Introduction: <br /> At the 40-07 Building on the west wall for bays one and three (as counted <br /> from the northl, install two rollup doors (one for each bay). The doors wili <br /> be eight feet wide by ten feet high with elactric operation (electrical hook-up <br /> wil� be done by Boeing at a later time►. <br /> Ref.: Mechanfcal scope of work attached. <br /> Construction Scope of Work: <br /> The Contractor shell in accord with drawing "A-1" and Framing Sketch "A- <br /> 1-A" and the referenced mechanicai drawings; locate and cut openings for <br /> two new doors; prov(de door framing and trim; and procure and install two <br /> S' X 10' rollup doors. This a�tivity will require the relocation of ducting and <br /> a gas supply Iine for the building heating system as described in the � <br /> referenced scope. � <br /> Motors for the doors shall be 480V 3 Phase and along with manual and <br /> —. electrical controls will be procured and installed by the contractor. Doors <br /> will not have automatic openers. Electrical supply to the motors wfll be <br /> supplfed by Boeing. <br /> Doors will be of similar style to the existing doors on the east wall of the <br /> 40-07 building. <br />