Laserfiche WebLink
MAYES �No s�w�N�� �"a `,..�"'"" <br /> t e,�.,�+m sn..�sw <br /> z�rr:� . suNsA-t <br /> Evenll,WA Bl2W <br /> ph 125.7@.9�0 <br /> W�25.715.1737 <br /> Juna 22, 2001 �0°""O1"0' <br /> �aoze s.T,00m.w.v <br /> SuM E-2 <br /> lYca�u.WA 961W <br /> City ot Everett a°�u��sei 3� <br /> 8uilding Division �,W„dp�„ <br /> 3200 Cedar 7Bt t NE 93rd D/ha <br /> Everett, WA 98201 s'"°"B0 <br /> wrn.nd,on enn <br /> ph 603.281.7515 <br /> lex 503281.7578 <br /> Attn: Mr. Tim Tyler <br /> FINAL LETTER <br /> Re: BoNnp 40-Z1 Bulldinp Structural Upprad� P�nnit N BdQ364 <br /> A-B/C-01-11 <br /> Ev�ntt,WA <br /> MTE ProJ�ct NE8106 <br /> Gentlemen, <br /> Thia is to infortn you that reyfatared specfel inspadfona hava been completed for thie project aa <br /> per our reports, copfes oi which have been sent you. <br /> To the best ot our knowledga, all work inepected was either peAormed in accordance with, or <br /> carrected to conform to, tha city approved drawings, or engineer approved changes. <br /> Special inspection was provided for: <br /> Visual Weld Inspection <br /> Nondestrudiva Teeting <br /> High Strength Bolting <br /> We trust that thia provides you with the iniormation which you require. Should you have any <br /> questiona give us a r.all <br /> Sincerely, <br /> MAYES TESTING ENGINEERS, INC. <br /> r � <br /> Michael S. Dolder, P.E. <br /> Vice President <br /> MSD:Iak <br /> E8106.closing(June2001) <br /> cc: Boeing— Sharon Culbertson <br />