Laserfiche WebLink
DOGING FUGL DOCK - TRENCH DRAIN JULY 1994 <br /> - Overall acope of Contractor activities <br /> - Site hazards <br /> - Shift schedules and work limitations for performance of work <br /> • Site Organization and Layour. <br /> - Site layout <br /> - L.ocatians of equipment and personnel decontamination stations <br /> - Storage location of safety equipment <br /> ■ Orientation and Training of Contractor Personnel: <br /> - Topics to be covered in the Orientation and Safety Training Program <br /> - Qualifications of person(a) responsible (or training <br /> ! - Identification of Contractor personncl to receive training and type of <br /> training, based on any prcvious training <br /> - Frequency and methods of updated training (or Contractor personnel <br /> - Identification of Site Safety Coordinator <br /> ■ Gmergency Response: <br /> - Contractor personnel roles, lines ot authority, training and <br /> communication <br /> - Site layout, securiry and wntrol, eefuges and eacavation routes <br /> - Medical/first aid provisions and equipment <br /> - Emergency procedures, documentation, reporting, and hospitai street <br /> directions <br /> ■ Recordkceping: <br /> - Extent and location of records <br /> - Recotd maintenance <br /> B. Contractor ahall maintain a wpy of the Site Hcalth and Safety Plan, as required by <br /> this Sxtion, on site and in Contractor's field office. <br /> 3.3 EMERGENCY RESPONSE REPORTING PROCEDURE: <br /> A. Due to the nature of adjactnt facilities, contaminated soils may be encountered <br /> during excavation. The most likely visible contaminant in the soil would be aviatian <br /> kerosene (let A fuel). <br /> B. In case of discovery of contaminated soils, Contractor personnel shall firat call : <br /> Owner's Authorized Reoresentative <br /> Sharon Clilbertson Offia: (206) 266-3453 <br /> (Construction Administrator) <br /> Alternate <br /> Jce Anderson Office: (206) 266-3421 <br /> (Safety) <br /> SAFETY AND EMERGENCY RESPONSE 01050 - 2 <br />