Laserfiche WebLink
BOEING FUEL DOCK - TRENCH DRAIN 1ULY 1994 <br /> SBCTION 02050 DEMOLITION <br /> PART 1 - GGNERAL <br /> 1.1 SUMMARY: <br /> A. This section includes the removal of existing construction to limits es indicated and <br /> specifiaf herein. Demolition inciudes the wmplete or partiel removal and disposal of <br /> materials of the foliowing: <br /> 1. Concrcte pavement. <br /> 2. Piping, manholes. I <br /> 3. Other items ae indicated. '. <br /> B. Related Work Specifed Eisewhere: <br /> A. Related Documents: Drawings and general provisions of Contract, including General <br /> end Supplementary Conditions and Division 1 Specifications Sections, apply to this <br /> Section. <br /> 1.2 REFERENCES: <br /> A. WashingG�n Industriat Safety and Health Act (WISHA). <br /> 1.3 SUBMI7TALS: <br /> A. Schedule of Demolition: <br /> 1. Submit as apecified in Sxtion 1300. <br /> 2. Submit proposed methods and operations of demolition for review priar to the <br /> atart of work. <br /> 3. Ptovide e deWted sequence of demolition and removal work to ensure the <br /> uninterrupted progress of the Owner's operations. <br /> 1.4 108 CONDITIONS: <br /> A. Baeing will be wntinuously occupying areas of the site immediately adj8cent to areas <br /> of eelxtive demolition. Co�duct selective demolition work in a menner that will <br /> mi• ,miu nad for dlscuption of Bceing's normal operetions. Provide minimum of 72 <br /> h�.�urs advance notice to Bceing of demolition activities which will aeverely impact <br /> Boeing's uortnal operations. <br /> D. Protections: <br /> DG�IOLITION 02050 - I <br />