Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
. � TO �E GOM�LEtED tY �P►LIC�N7 Ev�LUATON fOR <br /> AGtHCY UfE ONLY <br /> c. It the site p�n of� mi�ntion route? If w, explain. I <br /> No . <br /> d. Propond musura to praene or enhana Wildlite, if Any: ' <br /> No <br /> 6. E�y u/ N�hnl R�rcn <br /> �. wha� kinds of ener�y (eleetric, n�tunl gas, oil, wood stwe, solar) will be used to mxt <br /> the completed project's ener`y naeds^ Daeribe whether it will be u�ed for hnpn{, manu• <br /> f�cturin�, ete. <br /> Heating - natural gas or oil from existing steem plant. I <br /> Electricity - process pumps, lights, rtotors 6 lnstrumentation. <br /> b. Would your projat affat �he potential uu of wlu ener�y by �dj�ant propenia° If w. <br /> �enerally descnbe. <br /> No <br /> e. WAat kinds af enerp wnservation fnturo �re ineluded in the pl�ns of this propotal9 <br /> Litt other proposed mwsura to redua or control ener`y imp�ets, if�ny: <br /> Insulation will be provided to meet <br /> Wnshington State energy code, Gravity flow will be utilized <br /> to the extent possible rather than pumps. <br /> 7. �niro��u1 Hsltw <br /> a. Are there �ny en�ironmenul hnith h�vr�, includin� expowro [o toxie edeminit, ritk <br /> of firc and explosion, spill. or h�nrdou: waste, that wuld occur u a rault of this propaal^ <br /> If w. daeribe. <br /> Chemicals used w111 not in themselves create health hazards if <br /> properly handled�for safety, a11 chemicals w111 be transferred . <br /> by p1pe.81d'g sumps will be provided for accidental spills. <br /> Safety features are included to preclude flre or explosion. <br /> 1) Dacribe spccial emer4ency servica that mi�ht be required. <br /> Existing servlces provided by Boetng,city and county are <br /> adequate. <br /> 2) Proposed meuuro to redua or control environmenul haltA Aaurds, if�ny: <br /> Spill provision to contain accidental spills or contain <br /> spill from tank failure. <br /> b. N�in <br /> I) Wlut typa of noiu exut in t�e �ra w6ieA may dfect your projen (for e�umple: <br /> tn�t, equipmen� opention, othcr)4 <br /> None <br /> 2) What typa �nd levelt of noix Would be crnted by or auociated Wit� tAe project on � <br /> �hon-term or a lon�-term buis (for ex�mple: traftie, construttion, opm�ion, ocher)� Indi- <br /> nte whu houn noise Would come from the �ite. <br /> Ordinary constructlon noise during construction � <br /> 7:00 a.m. to 5:00 p.m. , none from sustalned operation. , <br /> I <br /> 6. � <br />