Laserfiche WebLink
• Ltr to Iadixr <br /> March 13, 1992 <br /> Page 3 <br /> under WAC 197-11-623 and 600 (4)(c) and enhanammt plan, and replscing that <br /> requieement with the Pigeon Creek No. 1 restoraaon projcct. <br /> In summary, the City of Everctt stmngly beGeves that a midgation requirement must <br /> relate direcdy to idendfied impacW and that miagadon of habitat impacts should be <br /> in-kind mi6gation and as cloxly rolated to the area of impact u pouible. We have <br /> identifieA a feaaible mitigation proposal ie the immediaoe viciniry of the Baeing site <br /> with aignificant public benefiu and roquest that thia mitigafion altemative be xlected to <br /> replace the previoua Powder Mill Creek mitigadon requirement. <br /> Thmk you for your considention, and plerae let us imow if you need any further <br /> informadon rogarding this mirigarion proposal. <br /> Sincerely, <br /> �"'"' �'��`•/ <br /> Paul RobeRs, Director <br /> by Robert A. Landles, Manager <br /> Land Ux Planning <br /> cc: Ken Hou�den, PubGc Worb <br /> Philip Schnieder, Department of Wildlife <br /> Rich Johnxm, Depaztment of Fisheries <br /> Bill I.eonard, Depertment of F�cology <br /> i►S Corps of Engineen, Regulatory Branch <br /> Mr. Frank Figg, Boeing Commercial Airplanes <br /> baeing <br />