Laserfiche WebLink
� � 1 <br /> • Ltr to LaJixr <br /> Macch 13, 1992 ( <br /> Page 3 <br /> under WAC 197-11-625 and 600 (4)(c) and enhanament plan, and repLacing tt,at <br /> requirement with the Pigeon Creek No. 1 restoradon project <br /> In summary, the Ciry of Everett strongly betieves that a midgation requirement must <br /> relate direcdy to idendfied impacu and that mitigadon of habimt imputs should be <br /> in-Itind mi6gation and u cloaely related to the area of impact as pouible. We have <br /> iden6fied a feasible mitigadon proposal in the immediste viciniry of the Boeing site <br /> with aignificant pubflc benefits and request t6at thia mitigation aloecnadve be xlected to <br /> replace the previous Powder Mill Crtek mitigadoa requirement. <br /> Thank you for your considention, and pleax let us lmow if you need any further <br /> informadon tegarding this mitigadon proposal. <br /> Sincercly, <br /> �Z,��,�.�.� <br /> Paul Roberts, Director <br /> by Robert A. Landles, Manager <br /> Land Uae Planning <br /> cc: Ken Housdea, Public Works� <br /> Philip Schnieder, Department of Wildlife <br /> Rich Johnaon, Department of Fis6eries <br /> Bill Leonard, Depnrtmsnt of Ecology <br /> US Corps of Enginan, Regulatory Branch <br /> Mr. Frank Figg, Boeing Commercial Airplanes <br /> boeing <br />