Laserfiche WebLink
I 01015 Page 6 <br /> MEASUREMENTAND <br /> PAYMENT <br /> Imade for concrete, u such,w�hid�is p�eced in stn+�b+�es for w�hich payment is made on a <br /> lump aum basis. No paymmt ahall be made for rejected swctural concrete, wazte ar <br /> � conuete used for the comeniena of the ConVactor. <br /> I <br /> O. Spilhvay and Retainin`WaW Gabions. Measurement o(HaWon aWcturea shall be based on the <br /> i number of cubic yards ot matedal accepubiy plead by type of installadon,in the completed work <br /> as Indicated on the drewings. Payment ahall consdtute full compa►saUon tor the supply and <br /> plaament(incJuding addi8onal excsvatlon)of Leaon materials,and rock. PVC liner end bedding <br /> I materials ere pafd tor at separate itertu. No �dditlonai payment w�ill be made tor excavation <br /> required W place gablons. <br /> P. Pat. Messurement of peat materielc ahall be based on the number ot cubic yards of material <br /> � acceptably placed fn 1he completed work ss fndicated on the drawAngs. Payment shall consC ute <br /> I full comperoadon for the supply. mbdng, sed placement of peat material. <br /> I Q. Sand. Meazuremmt ot sand matedals ahall be based on the number of cubic yards o(material <br /> acceptably placed in the completed work u indicated on the drawings. Paymmt shall constiwte <br /> fWl compensatlon for the supply,mbdng, and placement ot sand materiel. <br /> 1 R, Clbv Blodc. Measuremrnt of CIrQV Block ehell be based on the number ot square feet <br /> acreptably placed in the cbmpleted aork. Payment thalt constltute full compentation tor the <br /> supply and installadon ot ChIN Biock uid miscell�neous 6ro�m e�d a�chors at rcquired or <br /> neces�ary. <br /> S, PNC Linv. Meacurcment ot PVC Liner shall be beaed on the number ot square feet aaeptably <br /> placed in the completed work at Indiceted on the dnwdngs. Peymmt shail consdtute fuli <br /> � compensatlon tor the tupply end InsWlatlon ot PVC Lfner. <br /> T. PVC Plpe <br /> I1. Measurcment of PVC pipe ahall be baaed on the Wtal length o(pipe in piace, mcatured <br /> from end to end of the pipe, along the centedine of the pipe. <br /> ( 2. Paymmt for PVC pipe ahall oonstlate tuil oanpwatlon for fumishing, installing and <br /> tudng the pipe by size, in Place, euludin6 accawdon, flll, compactlon, pipe bedding <br /> � mnterid or aurfadng requtrcmenu,for vhich sepuate payment is made. <br /> U. Buttutly Vdva. Peyment, by type, shdl consdtuu futl oompensatlon (or the manufacture, <br /> delivery, Instailedon complete (including operators end conVols), end sadstactory operaUonal <br /> Itesdng ot the gate valve, including submission and approval ot�he required infortnation. <br /> V. Terminal Gravity Cleanout. Shal� be bued on s lump sum buis for all work and m�tedals <br /> � uqdred u apedfled end ahoan on the dnvfnga. Payment thall constlNte full compematlon for <br /> supply and Instaltatlon ot all componenu,Including RCP,IYI PVC pipe,and msnhole cover,noe <br /> speci8wlly paid for as other ftems. <br /> I W. Manhok. Fssilng menhole modiRcadon ahall be baud on�lump cum basis,including aIl work <br /> shovm on the Dnainga and Spedticatlana. Psyment thall consdtute full compensaUon for <br /> modi8catlona ot e�dstlng manhole ud sluta pte med�udama eed oompleting sll wrk indicated. <br /> ' ?C, MlsceU�nean Meuls. Messurcmmt ot mixxlleneau meula�hall be batied on e lump sum basis <br /> including but not Ilmlted lo ledden.auirs,hendre114 Lnta, vault ooven,acroent. posa,inserts, <br /> Iplats, thnut blocJcs and other miuelleneoua metel Itenu. Payment ahall mnsdtute tull <br /> BDBP <br /> � 090490 <br />