Laserfiche WebLink
I02102 Page 2 <br /> CLEARING AND <br /> IGRUBBQVG <br /> C. ConVactor ehall protect dl the environmenW resources, induding Powder Mlll Gulch and <br /> ' watenhed uen,vithin the project bouMaria u w�ell as those outaide the Ilmita ot pertnancnt <br /> work under this aontrM duritq the entlrc period af the contract. Conv�ctor�hall contine work <br /> acdvitla to uea defined by the Dnvinp ud SpedBudons. IdenNfy,pdor to the beginning of <br /> I oonsuucdon,ail Imd rdauca u�d private property deai��ted by Ne En�ineer to be prescrved <br /> withln the Contractor't wrorY.area. Do not rertave,a4 ddaa,inJurc,or destroy such raources <br /> or properry ineluding vees�tlwbs.vines,g�usea, toP aoil and land tortna. <br /> f D. Convactor ahall protect all private property ounide conswcdon work Umits trom conswcUon <br /> � acdvitla. Prior to ury comwcdon, the Conv�cuir ehell mark the areas within the wnstrucdon <br /> work limits that ue not required a accompliah all wrork W be pedortned under this Contract. <br /> � RpWct ecau to thae ueu. Stake�nd Il�g ieol�ted eren�vithin the gmeral aork area which <br /> are a be saved uW proteaed. <br /> � E. Convactor ehdl protect monumenta ud mulcen before oonswcdon operatlona commence. <br /> Where conswctlon operadons are W be oonduceed during darlmw, the merkera ahell be <br /> Illumfneted ao u to be vlaible In the dark Communiute W personnel the purpcne of inerking and <br /> protectlon ot dl necasery objects. <br /> � 3. E?CECIJi'ION <br /> I3At CONSfRUCI'ION CL.EARWG <br /> A. Cleu all vegeuted arcu W be oavpied by the peat weUends,mixed vetland+,conswcted atreams <br /> ( and other areu u ahown on the Dravinp. <br /> 3.02 GRUBBING <br /> IA. Grub eil conswcdon �Jearing ereat and other areas shown on the drawings. <br /> B. Fill ell surfaa depreulons lett by grubbing w�ith awcNre! fill or general flil material es indicated <br /> � on the draavings or u required end approved by the Deaign Englneer. <br /> 3.03 TOPSOIL <br /> � A. Strip the topeoil w�depth at at leut 6 ind�a w4thin the WNb d Ihe rcquired acavatlon and fill <br /> area�, end aWrc in deaign�ted tto�JCplle area. <br /> I B, (f orgaNc topsoU 4 prcunt deeper then 6 incha extend RWpping n requircd by the Engineer. <br /> Nry rcfilling shall be peAormed at the e�enx of the Conv�ctor,unlna the overcut Is rcqulred <br /> In w�ridng by the Dalgn Engineer, in w�hich cue paymmt tor auch acawtlon and flll ahell be <br /> � made at the applicable mnvaa unit prioes for the type of excewdon and till mede. <br /> C. Place topsoilt in stockpila that are separ�te and protected from other acaa soila stockpilee az <br /> I designated in Sectlon 02200. Coordinate the locadon a(topsoil atodcpllea Mith the Engineer prior <br /> w eu+pp+na or me wpaou. swdcpuea wqous shw ne uatizea a reclslm aesi�ated ercas ena <br /> ueas that are disturbed during conatrucdon. No �epante psymmt shdl be maAe for the <br /> stockpiling of toqoila and thdr utliiradon for du reawradon. <br /> I <br /> I <br /> J BDBP <br /> ` 090190 <br />