Laserfiche WebLink
� 0?200 Pa�e 2 <br /> EAR'fHWORK <br /> Iaqxtue d the Conv�ctor,unlm the overcut it��d or required In�uritlng by the Engineer, <br /> in wfiich cue payment tor�uch euandon end fill ahell be m�de at the epplicable contrect unit <br /> Ipdcxs for the auvetlon and rype d fill made. <br /> D. Convactor shW uu plant, equipmm4 wd4 � mad�ina vhich vW pedorm the work in <br /> I amordana wdth the requircmmta oovered by thae spadfleadons. At W dmea,Conaactar ahall <br /> maintaln in sadafactory wrkin�aondidon atl pl�nt,WuiPment tool and machina. F�ccavating and <br /> plent equipment uted in the aea tran wfiid� fill ud borrow�materlali ue obWned ahall be <br /> capable of produdn�the necwary blendin�reqdred w cansistentlY meet the tpedtied gradatlon <br /> � requircmena. Compactlon eqdpment�halt be wiuMe tor the wil: w be compacted w as w <br /> consiatently produa the requircd wil demitla throughout the compacted soil mess as required <br /> by Ihe Convsct Documena. <br /> ( E. Limin of or on the excavadon tor the varfout avuctura and works are as indlcated on the <br /> Drawinga, exapt th�t Iimits may be increaaed or decrased by the Daign Engineer if, {n the <br /> I opinion ot the Daign Engineer, �he mndidom enoountered warrant such moNficadon. Except <br /> as othenvlae rcquired by the Daign Engineer in vridng, excavate W the profiles and secdons <br /> shovm an the Dra�uhqss. <br /> IF. Uu excavated materials for the vuioua rypa d fill to the Srestat pnctical extmt. <br /> G. Convactor shall e�acavate w that nev ard a4Nns permanent Improvemenn�hall not be darnageA <br /> I or subJected w tetUemmt or twrfmntal rtwvrment Repdr ury damage W permanent work due <br /> w �etUemmt or hori�tal moveme�t resWdna from acavadon opendons at the Conuacar'a <br /> e�ense• <br /> I H. Gnde end rcaeorc all aress diaturbed in eiry manner not requind for aompledon of 1he Work, <br /> during conawct3on. Rawrc disturbed ueu lo thdr o�iQinal`nde end protile. <br /> I1.04 QUALITY CONT'ROL TE5f5 <br /> A. 'Ihe Ca�tncWr th�ll perform Wallry Control tadng�as required W moniWr the oontortnance of <br /> I the work u�d maudds wdN the reqWremrnu d tAe Convact Documents,in aaordance eufth the <br /> provWau of sectlon OIIoo,Qua�iry Convol �nd Ausurance. <br /> B. Convactor ehW provide lebontory oontrol tatlng u neceesary w determine the suitability ot <br /> Imateriala w the wrork Sue1� I�borawry oontrol �hdl, aa s minfmwn,aonform to the following: <br /> 1. PeAorm optlmum mo{sture oontent-mndmum dry denciry, meohanical enalysis, <br /> � classifiatlon, Iiquid Iimi4 p��dc Iimit end plutldty inda tests for eech cJatnificadon or <br /> aource ot eoil matedo4 w be utllized for fill. Do not oompact ury fill in the work undl <br /> approval ot fill metedd by the F.n�ineer. <br /> ( 2. Uu treah eoil matedela tor each mmp�cdon teat apedmen. Do not reuu matedals. <br /> I <br /> 3. Add Ne daired emount of mixing vater for ach oanp�cNNa�tat�pedmm,mbc�vell,and <br /> ( place in a container Mth m drtight cover u�d Wov to cure tor 21 houn. At approved by <br /> the En�ineer, a ehorter auin� tlme mq be uud w�herc trsu �hov that �hortenlnj the <br /> curing tlme shell not at►ect the reaula, <br /> I <br /> ( <br /> I BDBP <br /> 090190 <br /> 1 <br />