My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
RAIL SPUR SITE 45-YD
>
3003 W CASINO RD RAIL SPUR SITE 45-YD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 2:56:40 PM
Creation date
1/25/2017 3:07:20 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
RAIL SPUR SITE 45-YD
Notes
RAIL SPUR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOEING EVERETT SECTION 34 17 14 <br /> NEW RAIL SPUR BALLASTED SPECIAL TRACKWORK <br /> WORK ORDER 10•305 <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION <br /> A. This Section includes specihcations for the construction of ballasted special treckwork af varioua <br /> sizes end configurations mounted on timber switch ties and the fumiahing of special track materials <br /> as indicated. <br /> 8. The conslruction of ballasted speciel trackwork shefl include: <br /> 1. Heuling of construction materials. <br /> 2, Welding of special trackwork reil jointa. <br /> 3. Construction o1 apecial trackwork. <br /> 4. The above construction includea pertinenl special lrackwork related items associated with <br /> special lrackwork ilems such as thertnile welds;temping, suAacing, lining and gauging,lie <br /> drilling, and other operations necessary lo construct en acceptable r.omoleled special <br /> lreckwork structure. <br /> 12 REFERENCE STANDARDS <br /> A. American Railway Engineering and Meinlenance of Way Associalion, Manual for Railway <br /> Engineering, herein referred to as the AREMA Manual. <br /> B. American Railway Engineering and Mainlenance of Way Association,PorNolio of Trackwork Plans, <br /> herein reterred lo as the AREMA Portfolio. <br /> C. BNSF Guidelines for Induslrial Track Projects <br /> 13 SUBMITTALS <br /> A. The following submitlals shall be made by the Contractor. <br /> 1. The name(s) of the suppliers and manufacturers for the special trackwork components <br /> including. <br /> a Shop drawings for the various types of special trackwork and supporting drewings. <br /> b. Installalion and maintenance instruclions by the manufadurer for the various trackwork <br /> components. <br /> 2 Detailed descnptions of construction melhod Work Plan 90 days prior lo commencing <br /> trackwork reqmred for the work specified in this Sedion. <br /> 3 All test results mcluding eleclncal test in accordance with Sedion 34 11 11.Ballasted Treck <br /> Construclion. <br /> Perm�l Sel 34 17 14- 1 <br /> September23 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.