Laserfiche WebLink
LOCKWOOD GREENE. INC. <br />08/28/91 <br />MATERIAL COST i LABOR COST 05:09 PM <br />I TEMI DESCRIPTION <br />I9' <br />OTY UNITi UCM MATERIAL i UCL UMH HOURS CFT RATE LABCR i TOTAL <br />103 DEEP <br />1 E <br />104 10' DEEP <br />2 E <br />105 11' DEEP <br />2 E <br />106 12' DEEP <br />1 E <br />107 FRAMES B GRATES FOR C.B. <br />9 E <br />MANHOLES - 48" DIA. <br />108 9' DEEP <br />1 E <br />109 11' DEEP <br />2 E <br />1'J 12' DEEP <br />2 E <br />111 13' DEEP <br />1 E <br />112 15' DEEP <br />1 E <br />MANHOLES - 54" DIA. <br />11S 13' DEEP <br />1 E <br />114 14' DEEP <br />1 E <br />115 15' DEEP <br />1 E <br />116 17' DEEP <br />1 E <br />117 EXTEND C.S. 24, 1.54 <br />1 LOT <br />ASPHALT PAVING <br />22 10" COMPACTED AGGREGATE BASE <br />14,664 TON <br />23 PLACE BASE STONE <br />7.718 CY <br />24 PRIME COAT <br />27,895 SY <br />25 TACK COAT <br />27,895 Sy <br />26 5" INK ASPHALT <br />8,020 TON <br />2 UTR2 <br />PAGE NO. <br />