Laserfiche WebLink
r <br />TABLE OF CONTENTS <br />1.0 INTRODUCTION ................................... 1 <br />2.0 METHODS OF HYDROLOGIC ANALYSIS <br />A. TOPOGRAPHIC SURVEY ............................ 1 <br />B. FIELD VERIFICATION ............................ 2 <br />C. EVALUATION PROCEDURES ......................... 2 <br />3.0 <br />EVALUATION OF <br />SITE HYDROLOGY UNDER <br />PRE -DEVELOPED <br />CONDITIONS ...................... <br />5 <br />3.1 <br />SIMPLIFYING ASSUMPTIONS ....................... <br />7 <br />4.0 <br />RESULTS OF ANALYSIS FOR <br />PRE -DEVELOPED <br />CONDITIONS ...................... <br />e <br />A. <br />EVALUATION OF <br />NORTHWEST BASIN AREA ............ <br />B <br />B. <br />EVALUATION OF <br />SOUTHWEST BASIN AREA ............ <br />9 <br />+ 4.1 EVALUATION OF SITE HYDROLOGY FOR <br />DEVELOPED CONDITIONS .......................... 10 <br />4.2 RESULTS OF SITE ANALYSIS FOR <br />DEVELOPED CONDITIONS .......................... 14 <br />A. EVALUATION OF NORTHWEST PARKING AREA, <br />BASIN1....................................... 14 <br />B. EVALUATION OF ROOF DRAINAGE FROM <br />40-04 i 40-06 BUILDINGS, (BASIN 2) ............ 16 <br />C. EVALUATION OF THE SOUTHWEST <br />PARKING AREA. (BASIN 3) ....................... 17 <br />4.3 DETENTION STORAGE AND PEAK RATE RUNOFF <br />CONTROL REQUIREMENTS .......................... 1S <br />A. NORTH DETENTION POND .......................... 21 <br />B. SOUTH DETENTION POND .......................... 25 <br />4.4 EVALUATION OF PERFORMANCE OF DETENTION <br />PONDS FOR DEVELOPED CONDITIONS ................ 28 <br />5.0 REFERENCES <br />Im <br />