Laserfiche WebLink
1 <br />itttlttititlltltlltttittltttlltitt11t11ititltit111i <br />t CONDUIT COURANT CONDITION SUMMARY 1 <br />1 TIME IN MINUTES DELI > COURANT TIME STEP 1 <br />titttllitltlttttllttltllititltlttlitltltitltllitlll <br />t SEE BELOW FOR EIPLANATION OF COURANT TIME STEP. 1 <br />tlttllllllltlltltitlitlltitltltlltlttlltlltlttlitll <br />CONDUIT 1 TIME(MN) CONDUIT 1 TIME(MN) CONDUIT 1 TIME(MN) <br />--------- -------- --------- -------- --------- <br />CONDUIT 1 TIME(Mll) <br />-------- <br />91111 806.11 98112 611.16 91813 311.111 <br />--------- -------- <br />91184 1.18 <br />9N15 0.11 <br />1 <br />tltttlitllltlllltlllllllitltlllitflllitltllllllt <br />I CONDUIT COURANT CONDITION SUMMARY I <br />IItI1t11111tittltt11it11lilititltllllitltlltlllt <br />t COURANT • CONDUIT LENGTH 1 <br />t TIME STEP •-------------------------------- I <br />1 VELOCITY • SBRT(GRVTIAREA/WIDTH) 1 <br />Ittllllllttltlltltitltllltllltllititllittittlitt <br />AVERAGE COURANT CONDITION TIME STEP(SECONDS) 1 <br />tllititltltlltllitlltltltlllllttllllllllittltllt <br />CONDUIT 1 TIME(SEC) CONDUIT 1 TIME(SEC) CONDUIT 1 TIME(SEC) <br />--------- -------- --------- -------- --------- <br />CONDUIT 1 TIME(SEC) <br />-------- <br />91111 80.43 91112 76.05 91113 85.50 <br />--------- -------- <br />91184 02.11 <br />91185 61.18 <br />1 <br />Iltitllttltttlttllitltltttitl1t1111tltittlitlilt111 <br />1 EITRAN CONTINUITY BALANCE AT THE LAST TIME STEP 1 <br />itlttllttltltlltltltltltltltltlttilitlttltltitllt/t <br />Itllllllitltlititltitttllllllllltitlltlllttllitt <br />t JUNCTION INFLOW, OUTFLOW OR STREET FLOODING 1 <br />Itittlitltlttltlttllitittttltlltltittttlititllll <br />JUNCTION INFLOW, FT3 <br />-------- <br />------------ <br />7180 7.9571E+11 <br />JUNCTION OUTFLOW, FT3 <br />TON 1.3817E-1l <br />1N 3.1593E+11 <br />2N 2.1411E+04 <br />311 1.2125E+11 <br />1N 7.7269E+11 <br />Illititllllllitititllltllltltllttitittllllllltllttlittl <br />1 INITIAL SYSTEM VOLUME = 2.5793E-I1 CU FT 1 <br />I TOTAL SYSTEM INFLOW VOLUME 7.9571E+11 CU FT 1 <br />t INFLOW • INITIAL VOLUME = 7.9571E+11 CU FT 1 <br />Illltlllllltlittllllltltltlittltlitllltitlltlittlitittt <br />t TOTAL SYSTEM OUTFLOW 6.1211E+11 CU FT 1 <br />1 VOLUME LEFT IN SYSTEM 1.5611E+11 CU FT 1 <br />t OUTFLOW ♦ FINAL VOLUME 7.9811E+11 CU FT 1 <br />Ittitltltllttlllllltttltttltlllttlitllttititittllltlitl <br />1 ERROR IN CONTINUITY, PERCENT = -8.31 1 <br />