My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD TEMP CONCRETE BATCH PLANT FOR 767 2018-01-01 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
TEMP CONCRETE BATCH PLANT FOR 767
>
3003 W CASINO RD TEMP CONCRETE BATCH PLANT FOR 767 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 9:27:20 AM
Creation date
1/25/2017 3:49:13 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
TEMP CONCRETE BATCH PLANT FOR 767
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�G r�a(� <br /> PLANN/NG AND Allan Gil;en <br /> CO�NMUN/TY DE//ELOPA�IENT Director <br /> ��ir'lsy�i�r' <br /> /-. L.� _;:� _' ! '. (rls.nd if•c� <br /> May 18, 2010 <br /> Prte McGuirc r <br /> Civic Af(airs and Land Uze Planning � �������I�' <br /> The flocin�Company <br /> P.O. [lor 3707, MS OH-13 M.�.Y � � ��.� I. <br /> SealUe, WA 9812� <br /> PUI3LIC WO(�Kg <br /> RE: Boeing Everett Temporary Concrete Batch Plant r ' '- } <br /> Dear Pete, <br /> This is in reply to your letler o( May 3, 2010 regarding the temporary concrete batch plant tl�at would be <br /> in:lalled as part of the towpath reiocation projecl for the 767 model final assembly line. As you recall, <br /> the City reviewed and approved the 7G7 projec[ and iszued a Planned Action Detennination on March <br /> 29, 2010. We understand that batch plant is temporary, would be installed at the same location used <br /> previously (or a similar operalion in 2008, and that necessary permits have been obtained (rom the <br /> Department of Ccology and Pu�et Sound Clean Air Agency. The propozed schedule for operation of the <br /> balch plan is lwie 2010 through february 20]1. <br /> Since the batch plant would be installed as part of the construction phase o(the 7G7 line relocation <br /> project, the City would consider it incidental activity to the 1991 master plan and would not require a <br /> u�parate SCPA revi��w or land use penniL Pleasc notc that a pennit will be required from the Pennit <br /> Scivices Division. <br /> If you hav� any qucstions or �vould like tu disruss this matter fwlher, plrasc fecl free �o contact Dave <br /> Tylrr or m�� �il (42�i) 2�i7 R731. <br /> Sinccrcly, <br /> �/ � <br /> / ' � . ' •— <br /> , ti ,.�` <br /> l\���/.�.:��;j'`� , . . , - _._ ` - ' � <br /> �Il,in Gif(op ; <br /> I�iioctor and SIJ'� Responsible O((icial <br /> (i �. Kiik Hrooks, Pcnni� Si�rvices <br /> CIl Y OF FVERGIT • 7930 Wetmore Avrnue, Suile 8-A• Everelt. WA 98201 • (425) 257-8731 • Fax (425) 257-8742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.