Laserfiche WebLink
The subject property consists of one drainage basin which currently discharges storm - <br />water as sheet flow to the north as dictated by topography. The project site will be <br />regraded to minimize pavement slope and to maintain adequate drainage patterns for a <br />discharge into the existing storm drainage conveyance system located in West Casino <br />Road. A storm drainage system will be provided for this project in accordance with City <br />of Everett standards and guidelines. The system as designed will be relatively main- <br />tenance free and provide the required biofiltration, via grass -lined Swale. In addition, <br />an underground storage tank (1,000 gallon) shall be provided for on -site "wash -down" for <br />possible gasoline spills. Stormwater will also pass through an oil/water separator vault <br />prior to discharging into the existing city owned storm drainage system in West Casino <br />Road. The proposed storm drainage systems shall be sized to adequately handle runoff <br />produced by a 25-year storm. Please reference the drainage and pipe sizing calculations <br />provided in this report. <br />• _ : u � :: _ bY6'il <br />The City of Everett has indicated the existing storm drainage system located in West <br />Casino Road has been designed to adequately handle the runoff produced the contributing <br />drainage basin in which the subject property lies without the provision of detention. <br />Therefore, it has been indicated that a downstream drainage analysis will :iot be necessary. <br />