Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As oer Public Works approved plan dated __ <br /> 5. Connect side sewer per City Standard #'601. <br /> 6. Connect side sewer per City Slandard #'s 601, 602, 604. <br /> �$ Connect all roo(top downspouts to lhe side sewer. <br /> i'`8�Connect rooftop downspouts lo the drainage system provided for this lot. <br /> �J <br /> 9. Rooflop runo(f must be discharged to a roof downspout in(iltration system per City of Ever�tt <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor musl meel with the Public Works Inspecter to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public WorE;s inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per Cily o( Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 1�1. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on lhis building lot. <br /> 15. Remove and repiace curb, gutter and sidewalk as per City of Everett Standard Plan #'S 305A <br /> & 306 on lhis proposal's frontage as directed by the Public lNorks Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16 Install a Type I concrete driveway per City of Everetl Standard #307. <br /> 17 Pave driveway (rom the (ront property line out to the street paving. <br /> 18. Contact the Water Districl for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20 If a sewer pump system is to be installed. the pressure line must discharge into a private <br /> manliole, then gravity flow across the public right-o(-way. <br /> 21 A sprinkler system is required (or this building in compliance wilh the requirements oi NFDA <br /> Standards 13D. <br /> ��_�� ��! �i� �� f� (i�¢-��`_� . l �)�5 �j�(i ��n�y5 ,���' ��WC�' Y'UhS Llnc%.�� ��)c_ <br /> ' t <br /> ,,,. ",.,,;' ��ir�'r'� �� � r, lcL�rnS ,('c,�f Y/i �r�f. . CiK��•:`iS�� n�1����ho�-S �a -���: Ala1r� � cri,c� <br /> ' C� O�.:l�C �I( CC1�q�_(T (� "f�ii{ �0f49�fi1��r �G.1lrSC F7�OC. I��G��-/t�� TC 7�Z <br /> ' �l'� � �\ 1 _.-F p1.Ur,bin�c rocl� ����d�, �h,_ �vil°c�in� - <br /> ���� <br />