Laserfiche WebLink
DAILY REPORT <br />Job. No. <br />E-352 <br />Page 1 of <br />Client: City of Everett BuildingDepartment <br />Reporn S.yuenc• No. <br />were , Washington <br />Der. <br />Da, of week <br />_ <br />- O� <br />Technician <br />Gp <br />HRS Ch.r,.d <br />24 <br />A.....ante <br />HRS Chor,.d <br />Project: Support Center <br />1. Concrete Inspection: <br />Observed Placement Qf 43 yardsf Concrete in Panels #ice <br />1--Eaflt and #3 West. 3s.,Ylinders--and--Blump_xerArAaken_ <br />for control (refer to concrete teat reportg#30 and #11) <br />--One--extra set of 3 cylinders -was taken for field cure eo- <br />hat contraCtOrsan lift -panels if 7 day field cured - <br />reaches its required 2500 p.s.i. Concrete Mas plaCed in <br />accordance with plans and specifications, <br />2, Weather:__Cloudy_and-snow- <br />INDUSTRIAL TESTING, INC. <br />B : <br />Thomas C. Nielsen <br />Assistant_ General- Manager__________ <br />1 City of Everett Bldg. Dept. <br />2 Br-yanta, Butterfield, Frets & Associates, Architects <br />sae Vanden Ends, Structural Engineer <br />1_Metropolitan Construction Co.__ <br />— <br />aa <br />INDUSTRIAL TESTING, INC. <br />