My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 CEDAR ST 2018-01-02 MF Import
>
Address Records
>
CEDAR ST
>
3200
>
3200 CEDAR ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 1:20:26 PM
Creation date
1/25/2017 11:03:17 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3200
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />BRYANT, BUTTERFIELD & FRETS Kai <br />TELEPHONE 252-3304 717 MEDICAL -DENTAL BUILDING • EVERETT, WASHINGTON 98201 <br />INSPECTION REPORT ''a �✓il.%�`,v'c <br />c- —.�-- <br />Pacific Avenue at Cedar Street i <br />Job Name Support Center Fad lity Location l' <br />`yarll.Washington <br />Contractor <br />Person contacted Wilbur Gardner $ Mr. _Moretti Date September 9 1971 <br />Partly sunny, 53° <br />On site: 8:15; off site: 9:10 <br />PROGRESS STAGE <br />or prW�C og�ng on underground for surface drainage. <br />Clearing and rough grading for main building foundation (south end) just starting, <br />Conti -actor eypects to start footing excavation for main building early next week and to start <br />construction of barricade fence along Spruce Street either tomorrow or Monday. <br />Inspection of pit from which paving base course material will be taken was made with Mr. <br />Morretti. Pit is south of the John Jump Road about two miles north of Snohomish and contains <br />xlLKJ suitable material stratified in pure sand, Contractor is ad <br />RWvised to check material <br />delivered to site to ensure that it is within the specification requirements. <br />Superintendent requested clarification of main building foundation details 5/2 and 6/2. <br />Telephone call to structural engineer resulted in decision to provide a construction joint <br />between the floor slab and the loading platform slab at door openings at interior face of <br />tilt -up wall as shown on Detail 1/ 1. <br />0 <br />Copies to, <br />Contractor <br />Owner <br />File By <br />
The URL can be used to link to this page
Your browser does not support the video tag.