Laserfiche WebLink
lob. Nu. <br />DAILY REPORT <br />Client: City of Everett Building Department <br />R lP arl bawno Na. <br />Everett, wasoington <br />Dan <br />" .1/, I <br />Day a1 Wok <br />Pri <br />Techniclan <br />MRS Charged <br />Aul.rann <br />NR5 Charged <br />Project: Support Center <br />1. Reinforcing Steel and Forms Inspection: <br />Inspected placement of reinforcing steel and forms in sub - <br />grade mall footings perimeter area of building at line 1 <br />from row "A" to "F" and row "F" from line 1 to o. Steel and <br />forms were placed in accordance with plans and specifications. <br />2 Weather: Clear - 60° F. <br />INDUSTRIAL TESTING, INC. _ <br />By: 2� <br />Thomas G. Nielsen <br />Assistant General Manager _ <br />Distribution: <br />y of Evere u ng ept. <br />2 Bryants, Butterfield, Frets & Associates, Arrh. <br />ase an en n e, F.ngr. <br />1 Metro olitan Construction Co. <br />le <br />/joj <br />INDUSTRIAL TESTING, INC. <br />