Laserfiche WebLink
N <br />DAILY REPORT <br />Job. No. <br />E-352 <br />Page 1, of 1 <br />Client: City of Everett Building Department <br />Report Sequence No. <br />y <br />Everett, wasfiing on <br />Dab <br />0/6/71 <br />Day a Week <br />wr_d <br />Technician <br />GP <br />HRS Charged <br />4 <br />lnieronn <br />HRS Charged <br />Project: Support Center <br />1. Reinforcing Steel Inspection: <br />Inc ected placement of reinforcing steel in column footings <br />C-6 C-7 C-9, and D-9, and footings grid line 6 A-D, (8 <br />A-F A 5-7 and A -B of warehouse and office structure; <br />Also column footing B--7 of covered parking #201. Steel was <br />laced in accordance with plans and specifications. <br />2. Concrete Inspection: <br />Observed placement of 21 yards of concrete in the above lob <br />areas. 3 cylinders and slump were taken for control refer t <br />concrete test report #7). Concrete was placed in accordance <br />with plans and specifications. <br />3• Weather: Cloudy and Calm - 620 F. <br />IITDUSTRIAL TESTING, INC. <br />�ulras <br />Assistant General Manager <br />Distribution: <br />y ol Everettu ng ep . <br />2 Bryants, Butterfield, Frets, & Associates, Archi.te t <br />ase an +ten n e .J ruc ura . E iine^r <br />1 Metropolitan Construction Co. <br />/jo <br />INDUSTRIAL TESTING, INC. <br />