Laserfiche WebLink
DAILY REPORT <br />Job. Yo. <br />E-352 <br />Pa9a 1 of L <br />Client: City of Everett Building Department <br />Everett, wastnngton <br />R'aarr ia.aa. Na <br />Dora Day of Ru4 <br />.0/21/71 Thur <br />Technician <br />GP <br />HRS Charged <br />1 <br />Aulabnb <br />HRS Charged <br />Project: Support Center <br />1. Reinforcing Steel Inspection: <br />Inspected placement of reinforcing steel <br />H and N on grid line 2, and Pads type N. <br />in footin ads type <br />arid line 0 : Also <br />grade beam rid lines B -10 and A <br />-10 of washing <br />building 102• Also columns A-4 A-5 <br />A-6 A- <br />and B-8 of covered parking #101. Steel <br />A-8 <br />was placed in <br />accordance with plans and specifications. <br />2. Concrete Inspection: <br />Concrete placement cancelled due to the contractor not having <br />any 7/8 0 anchor bolts for columns A-8 and B-8. <br />3• Weather: Cloudy and Calm - 460 F. <br />INDUSTRIAL TESTING, INC. <br />By: C <br />Jomas J.e sen <br />Assistant General Manager <br />Distribution: <br />y of Everettu ng ept. <br />2 Bryants, Butterfield, Frets & Associates Arch. <br />ase Vanden Ende, Structural Engr. <br />1 Metropolitan Construction Co. <br />e <br />/joj <br />INDUSTRIAL TESTING, INC. <br />