Laserfiche WebLink
DAILY REPORT <br />Job. No.E-352 <br />Pop. 1 of 1 <br />client: City of Everett Buildirg Department <br />Everett, wasnington <br />R.00rt Sedwna Ne. <br />19 <br />Date Der "' W@.L <br />O/29/7 Fri <br />Technician <br />JWE <br />NRS Cha,ped <br />2 <br />A+.1 •i.��+ NRS Charp.d <br />Project: Support Center <br />1. Reinforcing Steel Inspection:_ <br />Inspected placement of re -bar steel in footings, line B-1 <br />A 1 to • Also found footing on line A-3 <br />moved to accommo- <br />date bolts on line 4. Steel was placed in accor,nce with <br />plans and specifications. <br />L2:::Concrete�tion:�� <br />Observed placement of 10; yards of concrete in the above Job <br />areas. 3 cylinders and slump were t Xen <br />for con <br />concrete test report 1 . Concrete was <br />with plans and specificatLons. <br />placed in accordance <br />3. Weather: Overcast - 40's. <br />INDUSTRIAL TESTING, INC. <br />ULI <br />homas Nie 7 sen CITY <br />Assistant General Manager <br />1971 <br />vV 3 <br />OF EVERETT <br />Distribution: <br />--r=ry—of Everettu ngepar5me—nE— <br />2 Br ante Butterfield Frets & Associates <br />Arch. <br />ase an en End-. tructural Engr. <br />1 Metropolitan Construction Co. <br />e <br />INDUSTRIAL TESTING, INC. <br />