My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 CEDAR ST 2018-01-02 MF Import
>
Address Records
>
CEDAR ST
>
3200
>
3200 CEDAR ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 1:20:26 PM
Creation date
1/25/2017 11:03:17 PM
Metadata
Fields
Template:
Address Document
Street Name
CEDAR ST
Street Number
3200
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />Pep, 1 0l i <br />Client: City of Everett Building Department <br />Report Se9eenee No. <br />20 <br />as ng •on <br />Der. <br />1/2/71 <br />Dar of Woo <br />Tue. <br />GP <br />HRS Cherped <br />4 <br />Anl,mnu <br />HRS Ch erped <br />Project: Support Center <br />1. Reinforcin; Steel Ins ection: <br />Inspected placement of reinforcing steel in slab on grade o <br />covered parking 101, grid lines (A-B) 4-8 and foundation <br />walls of repair and aervire building, grid lines (F) 1-3, and— <br />(1) A.5-F. Steel. was laced in accordance with plans and <br />specifications. No Burke Keyed Gold joint placed on slab c <br />grade of covered parking #101, between the curbs. Superintend <br />ent said that the curbs were blocked out and would be laced <br />at a later time and that the curb blockout would served as <br />cold joint. Also slop gird line 8 of the covered parking 10 <br />the thickened slab area was ommited at the architects re°uest. <br />2. Concrete Inspection: <br />Observed placement of 64 yards of concrete in the above Job <br />areas. 3 cylinders and slump were taken for control refer to <br />concrete test report #18 Concrete was laced in accordance <br />with plans and specifications. <br />3. Weather: Cloudy and Calm - 42-45° F. _ <br />INDUSTRIAL TESTING, INC. Distribution: <br />y o rere t Bldg. Dept. <br />s& <br />, 2 IIryante Butterfield FretFretT?Tomas <br />ssoc a e: e, rc ec s <br />gy; 1 Kase Vanden Ende, Struct. E:ng <br />C. e sen a ropo,. titn ons rue J.o.o. <br />Assistant General Manager 2 File /�1°i <br />I <br />Ws <br />d <br />kiwi)} • <br />DAILY REPORT Job. No. <br />E- 5 <br />INDUSTRIAL TESTING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.