Laserfiche WebLink
10 <br />DAILY REPORT <br />I� <br />Job. No. <br />E-352 <br />Pass 1 el l <br />Client: Ci of Everett Building Department <br />Report Sequence No. <br />21 <br />Vere t�3ngi3On <br />Date <br />1 1 <br />Dar el w..L <br />Wed <br />Technician <br />GP <br />H RS Chara.d <br />1 4 <br />Assistant. <br />HRS Char,.d <br />Pro ect: Surmort Center 01(Z) C) <br />1. T 'r <br />Inspected <br />pa king #101, (A-T1.) 1-4, sump walis in building #101, grid <br />lines A.5-B.5, Also placcment in curb of covered narking <br />201 grid lines (A.8) 1-8. Steel was placed in nonordanre, <br />with nlans <br />not Placed in the covered parking #101betkieen curbs from <br />gird lines A-B 1-4. <br />2. Concrete Inspection: <br />Observed placement of 50 yards of concrete in the above job <br />areas. 3 cylinders P.nd slump were taken for control <br />concrete test report 1 Concrete was placed in accordance <br />with plans and specifications, <br />3. Weather: Cloudy and Calm - 460 F. <br />TNDUSTRIAL TESTING INC. <br />By: i mac. . Distribution: <br />Thomas G. Ni.elsen 1 City of Everett Bldg. Dept. <br />Assistant General Manager 2 Bryants. Butterfield- <br />Associates, Architects <br />1 Kase Vanden Ende Struct. En <br />1 Metropolitan Construction Co. <br />2 File <br />0 <br />INDUSTRIAL TESTING, INC. <br />