Laserfiche WebLink
0 <br />i <br />DAILY REPORT <br />J.h. N.. <br />Pop. <br />0 <br />C1irnt: City of Everett Building Department <br />R.,.n S.q..... N.. <br />Everett, wasnington <br />_ <br />Data <br />1-12-- <br />Dar aI w..4 <br />-- <br />Tachnlclan <br />HRS Cha.p.d <br />A..iamnt• <br />HRS Charp.d <br />Project: Support Center - <br />1. Reinforcing Steel and Forma Inspection: <br />placement of re -bar steel and forms <br />in um <br />botto <br />-Inspected <br />walls in repair and service building, lip <br />—and <br />(4.2 to 4.3). Steel and forms were placed in <br />accordance with <br />plans and specifications. <br />2. Concrete :Cnspection: <br />Observed •Tlacement of 3 yards of concrete in <br />the above <br />job <br />areas. 3 c linders and slump were taken for <br />control <br />refer t <br />concrete test report #20 . Concrete was placed in accordance <br />with plans and specifications. <br />3. Weather: Cloudy Calm and Light Rain - 0's. <br />INDUSTRIAL TESTING INC. <br />B �c_. <br />Y: <br />homas C. Nielsen <br />Assistant General Manager <br />Distribution: <br />City or Everettbuilding ;par men <br />2 Bryants, Butterfield Frets 8c Associates Architects <br />ase an en n e, structural Engineer <br />1 Metropolitan Construction Company <br />e <br />/ o <br />....... <br />6 INC <br />TESTIN , <br />