Laserfiche WebLink
DAILY REPORT Jab. Ne. <br />E-392 J rUL,/,/ <br />i' <br />Pala ] of 1 <br />Repo" Sequence No. <br />Client: C1, t'y <br />of Everett Buildi De artment 24 <br />Everett, Wash ngton Data Day of weak <br />.1-18-7 Thurl <br />Technician HRS Charged <br />FD !I' <br />Assistant* HRS Charged <br />Project: Support Center -)no <br />I. Reinforcing Steel and Forms Inspection: <br />Ina ected placement of reinforcing <br />o s1 b of <br />and car wash slabparking a.e . Steel and forms were. niaced <br />in accordance <br />i� 2. Concrete Inspection: <br />Observed Placement of 77 yards of concrete in the aboveJob <br />— areas. 3 cylinders and slump were taken for nnntrol Irpf'pr 1-.. <br />concrete test report 22 . Concrete was placed in accordance <br />ith plans and specifications, <br />3. Weather: Overcast - 520 F. <br />INDUSTRIAL TESTIN INC. <br />Thomas C. N e sett <br />Assistant General Manager <br />Distribution: <br />y oEverett u d ng Department <br />?. Er ante Butterfield Frets & Associates Architect- <br />1 ER Vanden Ende, Structural Engineer <br />1 Metropolitan Construction Company <br />2 File <br />o <br />INDUSTRIAL TESTING, INC. <br />