Laserfiche WebLink
DAILY REPORT <br />Jab, No. <br />L- <br />Page T of T <br />Client: <br />City of Everetu builJiiir D.=Jartment <br />Report Sequence No. <br />2u <br />Everett, Washington <br />Dare <br />T-22-%- <br />Do, of weeA <br />Technician <br />GF <br />HRS Charged <br />I <br />A e+i +tam• <br />HRS Charged <br />PSuiDport <br />Center <br />1 Reinforcing <br />Inspection; <br />Inst)ected <br />placement of reinforcingsteel <br />in tiltu nels #2 <br />0 <br />Steel <br />was placed in accordance with plans <br />and specifications. <br />INDUSTRIAL <br />TESTING INC <br />Thomas C. Nielsen <br />Assistant General o r <br />Distribution: <br />1 City <br />of Everett Building Department <br />rchitects <br />1 Kase <br />1 Metropolitan <br />Vanden Ende, Structural Engineer <br />Construction Co. <br />2 File <br />/J o.i <br />INDUSTRIAL Jk511ND, mL. <br />