Laserfiche WebLink
I3 <br />DAILY REPORT <br />"' No. <br />Pay. 1 of <br />---_ <br />Client: City oC Evere .' Luildin' De art,nten <br />R.port Sega.nc. No. <br />2 <br />Everett, Washington <br />Date <br />1-2 - <br />Dry of R..h <br />Tue <br />Technician <br />GP <br />NRSCh.tg.d <br />4 <br />Assistants <br />NRS Charg.d <br />Pro ect: Suniport Center 1, <br />1. Concrete Inspettion- <br />Observed placement of 461 yards of concrete in panels <br />#2 and <br />#3 East#P West and #P south of offir--p building- <br />'i nyl Indprci <br />and slump were taken for control refer to c(2ncrete test <br />report 24 . Concrete wns placed in accordance with <br />r�pecifications, <br />2jan And <br />Weather: Cloudy with Light Rain - 450 F. <br />INDUSTRIAL TESTING. INC. <br />B C—A-t <br />Thomas C. Nie sen <br />Assistant General Manager <br />Distribution: <br />1 City of Everett Building Department <br />1 Kase Vanden Ende, Structural Engineer <br />1 Metro olitan Construction Co. <br />2 F le <br />/ o,• <br />INDUSTRIAL TESTING, INC. <br />QV <br />