Laserfiche WebLink
DAILY REPORT 1ob' He. <br />Papa 1 a1 1 <br />Report Spaenee No. <br />Client: City of Everett Building Department ?1 <br />Everett, Washington Date Day of Reek <br />.2-1-71 Wed. <br />Technician HRS Charged <br />TCN <br />Aeel .tans HRS Charged <br />Proaeet: Support Center <br />1. Concrete Inspection: <br />Observed placement of 44 yards of concrete in Panels 8 <br />east 5 6 7 west. Three 3 cylinders and slum <br />were taken for control refer to concrete test report #27. <br />Concrete was placed in accordance with plans and s ecift•- <br />cations. <br />2. Weather: Partly cloudy and calm - 350 F. <br />INDUSTRIAL TESTING, INC. <br />By: .SZ---- <br />nomas C. 143.ejsen <br />Assistant General Manager <br />i - <br />Distribution: <br />i u ng epar men <br />2 Bryants, Butterfield Frets & Associates Architects <br />I ase an en n e, rue ura ng neer <br />1 Metropolitan Construction Company <br />Aa <br />a <br />t <br />V <br />i <br />INDUSTRIAL TESTING, INC. <br />e <br />