Laserfiche WebLink
, <br /> � <br /> I SITE INFORMATION <br /> � UPSTREAM ANALYSIS <br /> i <br /> The CrystaLite facility roof downspouts c�irrcntly oudall to the south of the proposed Biringer <br /> Warehouse and sheet flow into a catch basin in the alley between Cedaz and Pine Street. 7 hese flows <br /> will be bypassed in the developed condition and be directed to the same catchbasin via an area drain and <br /> pipe system. Due to the generally 8at topography of the area and the proximity of this site to recent <br /> development tliere aze no other oCfsite tnbutary areas. <br /> DOWNSTREAM ANALYSiS <br /> I Site drainage generally sheet flows to the south east into the alley between Cedar and Pine Street where it <br /> enters a storm drain. A 12" catch basin and pipe system conveys flow south towazd 34�h Street. At 34`h <br /> I Street the drainage system tums easf ar.d crosses under Intentate 5 near the sign post pictured in Figure 4. <br /> The downstream unalysis was tertni�ated at this point as it is uncleaz where this pipe discharges on the <br /> other side of Interstate 5. It is appazent that the Flow conveyed by this catch basin s}5tem discharges into <br /> I the Snohomish River which is approximately 750 R east of where this downstream analysis was <br /> terminated. No signs of erosion or conveyance inadequacies were noted during a site visit. <br /> � <br /> I <br /> I <br /> I <br /> I I <br /> IDr�inage Report P e 5 <br /> Diringer Wurehouse lune 2qQ6 <br /> i <br /> I �l <br />