Laserfiche WebLink
f <br /> Ltr. Brockway(B0407-003) <br /> August lG, 2004 <br /> Page 2 <br /> Upon iesubmitml of the drawings, your application will be given priority and plan review will <br /> recommence. <br /> �,II required submittals shall be of sufficient detnil and contain sufficicnt information to ensurc <br /> that the proposed structure will be constructed in compliance with all adopted codes. <br /> Sincerely, � „^ , � <br /> J �/ M <br /> Steve Miller <br /> Associate Engineer <br /> �2 <br /> ornvn_wxwsTAu�n�txwwn m��»u crn�n sn <br />