Laserfiche WebLink
.._ . . . ... : . <br /> .. . . . _ � � .. . , I <br /> 2. If the lots are developed with a non-residential commercial structure or a residenNai <br /> structure of five or more units then full standard half street improvements are required to <br /> Chestnut Street, including but not limited to curb, gutter, sidewalks, street widenfng and <br /> drainage control per City Design Standards. <br /> 3. The proposal must comply with the Smali Lot Development standards as contained in <br /> Section 7 of the Cfty of Everett Zoning Code. <br /> 4. This project must comply with the current City of Everett Bui�ding Code. A buildfng pertnit <br /> is required for this project. <br /> This is an administrative decisfon that is appealable to the City's Land Use Hearing Examiner. An <br /> appeal must be filed with the Ciry within 14 days of the date of this notice. If you have queslions <br /> regarding this proposal or if you wish to fl�e an appeal, pleaae contact Becky Fauver,Clty of <br /> Everett Planning Department, at(425) 257-7281. <br /> i <br /> Date: August 3, 2004 <br /> t � <br /> � j�- /,�� :'�%�S� <br /> Allan Giffen, irector , ' — / , <br /> Planning and Community Development Department <br /> S:1BfauveASPU�04•007 14xx Chestnul.doc <br /> 4� <br />