Laserfiche WebLink
_ _..._.. .. . <br /> �- (_ - � . <br /> 2. If the lots are developed with a non-residential commercial structure or a residential <br /> structure of five or more units then full standard half street improvements are required to <br /> Chestnut Street, indud(ng but not Iimited to curb, gutter, sidewalks, street widening and <br /> drainage control per City Design Standards. <br /> 3. The proposal must comply with the Small Lot Development standards as contained in <br /> Sectfon 7 of tho Ciry of Everett Zoning Code. <br /> 4. This proJect must comply wilh the current City of Everett Buiiding Code. A building permit <br /> fs required for lhis project. <br /> This is an administrative decision that fs appealable to the City's Land Use Hea�ing Examiner. An <br /> appeal must be filed with the Ciry within 14 days of the date of this notice. If you have quesNons <br /> regarding this proposal or if you wish to flle an appeal, please contact Becky Fauver, City of <br /> Everett Planning Department, at (425) 257-7281. <br /> Date: August 3, 2004 <br /> . <br /> � � ' / � , <br /> ,� /?� �� <br /> Allan Giffen, irector ._ — " <br /> Planning and Community Development Department <br /> S:1BFauveASPU�04•007 14xx Cheslnut.doc <br /> 4�v <br />