Laserfiche WebLink
y <br /> CIASED CM WORK ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 08/10/1994 Paqe 1 <br /> av��ee=�vnea¢evea�vav��aav=vecvaaacavv=�evenvicee=-aea�aaeaeeevveanvav=av'covvaaa <br /> Date Ranqe :07/O1/1992 - 07/26/1994 <br /> CM Work Order Range :<Blank> - 8405421080229 Pattern :7101096710020 <br /> Item Ranqe :<81ank> - WP122020001 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> Qe�a�sasa����aaava�ana�acavvvv=vvveaen�ae�aaevoe=avv=n�aec='avevvvcvvvveeavvaaea <br /> CM WORK ORDER ID: 7101096710020 Title: REPLACE 1901 - CHESTNUT STREET <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: SMH2O95A08 -- MANHOLE <br /> Location ID: <br /> Proqram 710 Function 109 Activity 671 <br /> Date Completed: 07/11/1994 <br /> Overall Craft: <br /> Issued: 07/05/1994 Issued by: HDA Assigned to: <br /> Out of Setvice? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Re�ding: <br /> Downtime: 0 hours <br /> Status: HL <br /> Labor: ' ' <br /> ,,. <br /> Craft ID Name Planned Hrs Actual Hrs Cost � <br /> --___ ---�-- ------------------------------ ----------- ---------- --------- <br /> HEO AAL ARNOLD, ARTHUR L 0.00 4.00 74.08 <br /> SUP1 AGA AHLES, GREGORY A. 0.00 47.50 982.78 <br /> UL CJE CASE, JAMES E. 0.00 8.00 109.36 <br /> L3M DJP DE WITT� JAMES P. 0.00 2.50 51.38 <br /> UL GCR GRENZNER, CHRIS R. 0.00 4. 50 55.89 <br /> SUP2 HDA HALL, DONALD A. 0.00 0. 50 11.27 <br /> UL HDN HARRIS� DANIEL N. 0.00 11.00 155.81 <br /> HEO MCC MAGEE, CARL C. 0.00 36.00 682.20 <br /> EO MJL2 MITCHELL� JEFFREY L. ' 0.00 4.00 71.80 <br /> UMT3 SRF SCOTT, ROBERT F. 0.00 2.50 58.28 <br /> SUP1 WLK WARNER, LARRY K. 0.00 4 .00 84.52 <br /> UL WTE WEST\1ANG, TERRY E. 0.00 45.00 ____645_75 <br /> Total Labor Cost: 2983. 11 <br /> Materials: <br /> Ip Description Date # Used Cost <br /> ----- -------- -------- -------- <br /> CEME00061438 CEMENT 20 MIN. SET 50 L8. BAG 07/11/1994 3 31.86 <br /> CONC00061�38 CONCRETE MIX 60 LB. BAG 07/11/1994 6 12.84 <br /> COUP46�00047 COUPLING 8" CONC X 8" Cl/PL 07/11/1994 1 8.61 <br /> ELL046302247 ELL B" 22 1/2 DEG SP X GASKET 07/11/1994 1 <br /> p�1► MH BASE/LADDER/CONE (ASSOC) 07/11/1994 1 ,� 1521.94 <br /> N/11 C.D.F. (ASSOC) 07/12/1994 1 n� 202.85 <br /> p�� C.D.F. (ASSOC) 07/12/1994 1 � 304.28 <br /> , N�A C.D.F. (ASSOC) 07/14/1994 1 a 1014.28 <br /> ; N�A C.D.F. (ASSOC) 07/14/1994 1 � 253.57 <br /> N�� C.D.F. (ASSOC) 07/14/1994 1 104.4 <br /> PIPE46304347 PIPE 8° PVC SEWER 07/11/1994 5 -____12_05 <br /> Total Material Cost: 3 . 0 <br /> 7�.8� <br />