Laserfiche WebLink
, „. 3 3 <br /> 4 . , <br /> CLOSED CM WORK ORDERS REPORT <br /> UTILITIES Total Utility Maintenance Management System <br /> 09/27/1991 Page 1 ' <br /> Date Range : 10/09/1900 - 09/26/1991 <br /> CM Work Order Range : 1071090001 - 9321210331 Pattern : 6641197305 <br /> Item Range :<Blank> - WVL3195Y14 Pattern : * <br /> Utility ALL Program ALL <br /> CM WORK ORDER ID: 6641197305 Title: SO/1925 AB CHESTNUT - 3/4" METERED <br /> Item ID: -- <br /> Location ID: -- <br /> Utility 664 Program 119 <br /> Date Completed: 09/26/1991 <br /> Overall Craft: <br /> Issued: 08/09/1991 Issued by: SKL Assigned to: SKL <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hours Actual Hours Cost <br /> EO CCL CRAIG, CHESTER L. 0. 00 1. 00 15.71 <br /> UL DLM DRESSEL, LARRY M. 0. 00 1. 00 10. 30 <br /> UL OBJ O'LEARY, BRIAN J. 0. 00 1. 00 10. 30 <br /> WSW OMW OEHLERT, MICHAEL W. 0. 00 1. 00 15.71 <br /> Materials: Number <br /> ID Description Date Used Cost <br /> ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ 08/26/1991 1 5.73 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 08/26/1991 1 12 . 04 <br /> COUP34003947 COUPLING 3/4" 1/4 BEND COPPER@ 08/26/1991 1 4. 18 <br /> COUP34004447 COUPLING 3/4" OT X COP @ 08/26/1991 1 3 .42 <br /> METE36089447 METER 5/8" TRIDENT 08/26/1991 1 23 .39 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 08/26/1991 9 2 .43 <br /> SADD44016847 SERVICE SADDLE 6" W/3/4" CCT 08/26/1991 1 10.76 <br /> SETT34033647 SETTER COP 5/8" X 3/4" LGTH15" 08/26/1991 1 40.39 <br /> WIRE00119847 TRACING WIRE 10 GAUGE 08/26/1991 10 0.80 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> V2137 BOOM TRUCK(5 TON CRANE) GMC 84 08/26/1991 1. 00 4.48 <br /> V2150 SVC TRUCK FORD 2 TON 87 08/26/1991 1. 00 1.78 <br /> V3508 BACKHOE CASE 4X4 88 08/26/1991 1. 00 6. 09 <br /> Total cost for work order 6641197305: 167.51 <br />