My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021 CHESTNUT ST 2016-01-01 MF Import
>
Address Records
>
CHESTNUT ST
>
2021
>
2021 CHESTNUT ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 1:43:24 AM
Creation date
1/26/2017 1:43:04 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2021
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Beehtel Corporation <br /> July 24, 1997 Ter�acon <br /> P�ps 4 <br /> Should structural loads be concentrated on the perimeter of the slab, a monolithic tum down edge <br /> should be considered. Thickened interior sieb sections can be used to suppoR concentrated or <br /> continuous slab loading provided that slab th(ckness and reinforcement ere consistent with <br /> structural requirements. <br /> Foundations and slabs should be reinforced as necessary to reduce the potendel for distress <br /> caused by diNerential foundadon movement. Foundatlon excavatlona shouid be observed by the <br /> geotechnical engineer. If the soil cond(tions encountered differ significanGy from those presented <br /> in this report, supplemental recommendationa will be required. <br /> Se(smfc Considerations: The project sfte is located in Seismic Risk Zone 3, es indicated by the <br /> 1994 Uniform Building Code. Based upon the nature of the subsurface materials, a seismic site <br /> coefficient, "s" of 1.2 should be used for the design of structures for the proposed proJect (1994 <br /> Uniform 8uilding Code, Table No. 16-J). <br /> General Comments: The Geotechnical Engineer shou�d also be retained to provide services <br /> during excavation,grading,foundation and construct(on phasea of the work. Observation of driiled <br /> shaft and foundation excavations should be performed prior to placement of reinforcing and <br /> concrete to confirm that satisfactory bearing materials are present. These services are conaidered <br /> a necessary part of continuing geotechnical engineering services for the proJect. ConstrucUon <br /> testing, including field and laboratory evaluation of fill, backfiil, pavement materials, concrete and <br /> stee� should be peAormed to determfne whether applicable project requirementa have been met. <br /> It would be logical for Terracon Project Team to provide these additional services for continuity from <br /> design through construcQon and to detertnfne the consistency of field condiUons with those data <br /> used in our analyses. <br /> The anaiyses and recommendations in this report are based in part upon data obtained from the <br /> field exploration. The nature and extent of variations beyond the location of the teat boring may <br /> not become evident until construction. If variations then appear evident, it may be necessary to <br /> re-evaluate the recommendations of this repr.rt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.