Laserfiche WebLink
. - ( � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standerd #'s 601, 602, 604. <br /> � Connect all rooRop downspouts to the side sewer. <br /> 8. Connect rooRop downspouts to the drainage system provided for this lot. <br /> 9. RooRop runoH must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 j Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> �2. Install erosion control measures per City of Everett Standards for small parcels <br /> - � <br /> 13. Remove erosion control measures upon completion of the project prior to final epproval oi the <br /> permit. <br /> -� <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting oi material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standerd Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard ri307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan It410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then graviry flow across the public right-of-we�-. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PIYCommenis �Z <br />� _ __ __ <br />